To make the process go smoothly and efficiently, you need to before the installation. In the Full Spread procedure of installation, the adhesive is trowled over the entire substrate.
Before installation:
Removing the furniture is step one.
Remove all the contents from your cabinets or cupboards.
Maintain the indoor humidity level approximately between 45-65%
Moldings and baseboards may need to be removed as well.
We recommend that you discuss sub-flooring with us.
Prepare for the clean-up beforehand.
During installation:
Your presence is imperative on the day of installation.
Children and pets need to be kept out of the work zone.
After installation:
Ensure adequate ventilation for about 48 to 72 hours after the installation of your new floor.
Do not step on the seamed floor.
If the Full Spread method or Perimeter Adhered installation method is employed, keep in mind that no appliances are moved in for at least 24-72 hours.
If the installation is carried out using the Floating method, appliances can be moved in immediately.